Fixed Steel Smoke Barrier


The steel smoke barrier is a rigid smoke-blocking component of the building's smoke control and exhaust system. Its main body is formed by bending hot-dip galvanized steel sheets / stainless steel sheets, and it is vertically suspended below the floor slab, main beam, or ceiling to divide the building into smoke zones. In the event of a fire, it forms a smoke reservoir, preventing hot smoke from spreading laterally along the ceiling, ensuring the efficient operation of the exhaust system, and extending the evacuation time for occupants. The product strictly complies with the XF533-2012 "Smoke Barrier" standard and is supplied with complete fire protection testing documentation, meeting the requirements for fire protection review and acceptance in various projects.
+8618037198687
立即预约
产品详情

Product Advantages

✅ Rigid one-piece construction, strong smoke sealing performanceThe entire panel is formed by bending a single steel plate, providing rigidity without permeability. The assembled joints are treated with fire-resistant sealing, making it difficult for smoke to penetrate and ensuring stable and reliable smoke blocking.

✅ Robust and impact-resistant, with a long service lifeThe panel is made of hot-dip galvanized steel plate with a thickness of ≥0.8mm, offering rust and corrosion resistance, impact resistance, and resistance to deformation. It has no risk of aging or damage, requiring minimal later maintenance.

✅ Economical cost, high cost-effectivenessCompared to fire-resistant glass options, the cost is more favorable, making it suitable for large-area batch use. It is the mainstream choice for underground parking garages and industrial plant projects.

✅ Flexible processing, strong on-site adaptabilitySupports cutting holes and notches to avoid ducts and pipelines; color, smoke barrier height, and individual section length can be customized as needed. Modular assembly makes installation quick and convenient.

✅ Complete certifications, worry-free acceptanceThe factory provides certificates of conformity and type inspection reports, with complete documentation for smooth project acceptance.

Applicable Scenarios

Priority Recommendation: Underground parking garages, industrial plants, warehouses, equipment rooms, and large passages. It is also suitable for smoke partition zones in public buildings such as commercial complexes, transportation hubs, hospitals, and high-rise office buildings; ideal for large areas, low-decoration requirements, and areas with complex piping.

:Installation Instructions

  1. Fixing method: Suspended by hanger rods or embedded parts fixed to the floor slab, main beam, or main ceiling keel; can be directly suspended from the bottom of the beam.

  2. Joint treatment: Fire-resistant sealant is applied to seal the gaps between multi-section assemblies, ensuring the gaps meet specification requirements.

  3. Pipeline avoidance: Factory pre-cutting of holes and notches to accommodate ducts, cable trays, and sprinkler piping.

  4. Construction: On-site measurement, factory prefabrication, professional team installation, and coordination with fire inspection upon completion.

Service Guarantees

✔ Free on-site survey, drawing detailing, and smoke partition scheme recommendations
✔ Customized dimensions and colors per drawings, with batch supply support
✔ Complete documentation including certificates of conformity and fire inspection reports for acceptance
✔ Professional construction team for on-site installation, with after-sales technical support


热线电话:
+8618037198687
联系邮箱:
729423368@qq.com
联系地址:
河南省郑州市新密市刘寨镇张庄村五组
service qrcode
扫码关注
  • Contact Information*

  • Note*